Line 13 (Shanghai Metro)




































Line 13
SHM Line 13 icon.svg
Platform at West Jinshajiang Rd Station
Overview
Other name(s)M5 (planned name)
TypeRapid transit
SystemShanghai Metro
StatusIn operation
Locale
Pudong, Huangpu, Jing'an, Putuo, and Jiading districts
Shanghai
Termini
Jinyun Road
Zhangjiang Road
Stations31
Daily ridership490,000 (2018 peak)[1]
Operation
OpenedApril 20, 2010 (As Expo line from Madang Road to Shibo Avenue)
December 30, 2012 (Phase I western section)
December 28, 2014 (rest of Phase I western section)
December 19, 2015 (extended to Shibo Avenue)
December 30, 2018 (extended to Zhangjiang Road)
ClosedNov 2, 2010 ~ December 18, 2015 (Expo line)
Operator(s)Shanghai No. 2 Metro Operation Co., Ltd.
CharacterUnderground
Technical
Line length38.3 km (23.80 mi)
Number of tracks2
Track gauge
1,435 mm (4 ft 8 12 in)
Electrification
Overhead lines (1500 volts)
Operating speed80 km (49.71 mi)

Line 13 is a north-west to south-east line of the Shanghai Metro network. It runs between Jinyun Road in Jiading and Zhangjiang Road in Pudong. It will interchange with new lines 14, 15 and 18 in 2020.




To scale map of Shanghai Metro Line 13




Contents





  • 1 Stations

    • 1.1 Important Stations



  • 2 History

    • 2.1 Special Phase


    • 2.2 1st Phase


    • 2.3 2nd Phase and 3rd Phase



  • 3 Rolling Stock


  • 4 References




Stations








































































































































































Station name
Connections
Distance
km
Location

English

Chinese


Jinyun Road

金运路

0.00
0.00

Jiading

West Jinshajiang Road

金沙江西路

1.52
1.52

Fengzhuang

丰庄

1.94
3.46

South Qilianshan Road

祁连山南路

1.31
4.77

Putuo

Zhenbei Road

真北路

1.48
6.25

Daduhe Road

大渡河路

1.24
7.49

Jinshajiang Road

金沙江路

 3   4 
1.62
9.11

Longde Road

隆德路

 11 
1.21
10.32

Wuning Road

武宁路

0.85
11.17

Changshou Road

长寿路

 7 
1.08
12.25

Jiangning Road

江宁路

0.70
12.95

Hanzhong Road

汉中路

 1   12 
1.63
14.58

Jing'an

Shanghai Natural History Museum

自然博物馆

0.65
15.23

West Nanjing Road

南京西路

 2   12 
0.86
16.09

Middle Huaihai Road

淮海中路

0.96
17.05

Huangpu

Xintiandi

新天地

 10 
1.21
18.26

Madang Road

马当路

 9 
0.63
18.89

World Expo Museum

世博会博物馆

1.53
20.42

Shibo Avenue

世博大道

1.61
22.03

Pudong

Changqing Road

长清路

 7 
0.89
22.92

Chengshan Road

成山路

 8 
1.16
24.08

Dongming Road

东明路

 6 
1.40
25.48

Huapeng Road

华鹏路

1.15
26.63

Xianan Road

下南路

1.82
28.45

Beicai

北蔡

1.07
29.52

Chenchun Road

陈春路

0.93
30.45

Lianxi Road

莲溪路

1.34
31.79

Middle Huaxia Road

华夏中路

 16 
1.77
33.56

Zhongke Road

中科路

1.06
34.62

Xuelin Road

学林路

1.96
36.58

Zhangjiang Road

张江路

1.69
38.27


Important Stations



  • West Nanjing Road - located under the busy Nanjing Road.


  • Jinshajiang Road - located near East China Normal University and Global Harbor


  • Xintiandi - located by Xintiandi Style Mall and the renovated Xintiandi Shikumen neighborhood


History





























































SegmentCommencementLengthStation(s)Name
Madang Road — Shibo Avenue
20 April 2010
4.0 km (2.49 mi)
3
Expo line (special phase)
Madang Road — Shibo Avenue
2 November 2010
Temporary ceased operation
-3
Jinyun Road — Jinshajiang Road
30 December 2012
9.9 km (6.15 mi)
5
Phase 1 (1st section)
South Qilianshan Road
15 June 2013
Infill station
1

Daduhe Road
1 November 2014
Infill station
1

Jinshajiang Road — Changshou Road
28 December 2014
2.9 km (1.80 mi)
3
Phase 1 (2nd section)
Changshou Road — West Nanjing Road
19 December 2015
2.6 km (1.62 mi)
4
Phase 1 (3rd section)
West Nanjing Road — Madang Road
2.8 km (1.74 mi)
2
Expo line (1st section)
Madang Road — Shibo Avenue
Reentered operation
3
Shibo Avenue — Changqing Road
30 December 2018
1.0 km (0.62 mi)
1
Expo line (2nd section)
Changqing Road — Middle Huaxia Road
10.5 km (6.52 mi)
8
Phase 2
Middle Huaxia Road — Zhangjiang Road
4.8 km (2.98 mi)
3
Phase 3


Special Phase


The Special Phase of Line 13 was run between Madang Road and Shibo Avenue, during the 2010 Shanghai World Expo. After the Expo ended, this phase was closed afterwards.



1st Phase


The 1st Phase of Line 13 operates all the stations between Jinyun Road and Jinshajiang Road, with 7 stations. The section has opened in December 2012[2].



2nd Phase and 3rd Phase


The two phases run from Changqing Road to Zhangjiang Road in Zhangjiang Hi-Tech Park region. All the stations along this section have opened in December 2018.



Rolling Stock














TypeTime of manufacturingSeriesSetsAssemblyNotes
Type A2011–201413A0124Tc+Mp+M+M+Mp+TcManufactured by CSR Puzhen


References




  1. ^ 1223.1万人次!上海地铁全网客流昨天再创新高 (in Chinese). 新民网. 2018-03-10. Retrieved 2018-03-10..mw-parser-output cite.citationfont-style:inherit.mw-parser-output .citation qquotes:"""""""'""'".mw-parser-output .citation .cs1-lock-free abackground:url("//upload.wikimedia.org/wikipedia/commons/thumb/6/65/Lock-green.svg/9px-Lock-green.svg.png")no-repeat;background-position:right .1em center.mw-parser-output .citation .cs1-lock-limited a,.mw-parser-output .citation .cs1-lock-registration abackground:url("//upload.wikimedia.org/wikipedia/commons/thumb/d/d6/Lock-gray-alt-2.svg/9px-Lock-gray-alt-2.svg.png")no-repeat;background-position:right .1em center.mw-parser-output .citation .cs1-lock-subscription abackground:url("//upload.wikimedia.org/wikipedia/commons/thumb/a/aa/Lock-red-alt-2.svg/9px-Lock-red-alt-2.svg.png")no-repeat;background-position:right .1em center.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registrationcolor:#555.mw-parser-output .cs1-subscription span,.mw-parser-output .cs1-registration spanborder-bottom:1px dotted;cursor:help.mw-parser-output .cs1-ws-icon abackground:url("//upload.wikimedia.org/wikipedia/commons/thumb/4/4c/Wikisource-logo.svg/12px-Wikisource-logo.svg.png")no-repeat;background-position:right .1em center.mw-parser-output code.cs1-codecolor:inherit;background:inherit;border:inherit;padding:inherit.mw-parser-output .cs1-hidden-errordisplay:none;font-size:100%.mw-parser-output .cs1-visible-errorfont-size:100%.mw-parser-output .cs1-maintdisplay:none;color:#33aa33;margin-left:0.3em.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registration,.mw-parser-output .cs1-formatfont-size:95%.mw-parser-output .cs1-kern-left,.mw-parser-output .cs1-kern-wl-leftpadding-left:0.2em.mw-parser-output .cs1-kern-right,.mw-parser-output .cs1-kern-wl-rightpadding-right:0.2em


  2. ^ Shanghai Eastday, 7 February 2012.










Popular posts from this blog

How to check contact read email or not when send email to Individual?

Bahrain

Postfix configuration issue with fips on centos 7; mailgun relay